+853 6232 3380 · office@macxony.com
MacXonySaxony — Macau

Contract

Terms and conditions

Draft for mixed-container brokerage. Have counsel lock company name, seat and governing law before publication. Written for commercial buyers, not EU consumer retail.

1. Role

MacXony arranges and consolidates. It is not the manufacturer and does not build on site. Unless it sells in its own name, the factory remains the seller of each line. Several factories may share one container.

2. Offers and orders

Offers are non-binding until a written confirmation and any agreed deposit. Prices exclude freight, insurance, duty and local tax unless an Incoterm says otherwise. Photos and samples are approximate.

3. Mixed load

Different plants mean different lead times and papers. The box closes when cube, weight and documents fit. MacXony does not owe a perfectly stuffed cubic metre.

4. Payment and title

Deposit before procurement, balance before loading or against B/L copy, as confirmed. Title to goods sold by MacXony stays until paid in full.

5. Time and risk

Dates are estimates unless a fixed date is written. Force majeure, factories, customs, embargo, carriers and missing papers shift time. Risk passes under the agreed Incoterm. Insurance only if ordered.

6. Specification

What is confirmed is owed — not the destination’s building code. Voltage, plugs, threads and approvals often differ. Site adaptation is the buyer’s work. No installation, no permit, no finished house.

7. Claims

Inspect on arrival. Transit damage: notify carrier and MacXony within five calendar days. Other defects within ten days of discovery, at latest three months after arrival unless mandatory law is longer. Remedy is repair, replacement or reduction as practicable with the supplier.

8. Liability

Unlimited for intent, gross negligence and injury. Otherwise capped at the net value of the affected line. No lost profit, site delay, FX or authority decisions.

9. Trade controls

The buyer states destination and end use truthfully. MacXony may refuse. Circumvention of sanctions is not offered. Import licences are the buyer’s.

10. Close

Invalid clauses leave the rest. Governing law and venue: seat of the operator, subject to mandatory rules. Confirmation beats these terms; these terms beat the website. September 2026.